Sacred Heart College needed a new Mission House after the former 1970s building was assessed as seismically vulnerable. Maycroft supported the project through early contractor involvement and construction, delivering administration, library, learning and staff spaces within a laminated timber structure.

Completion
July 2024
Construction Value
$8.7M
Type
New Build
Awards

2025 - Wellington Architecture Awards Winner - Education category

‍

Sacred Heart Colleges New Mission House was completed in July 2024. The team is extremely proud of the outstanding result. The design is complex and detailed, and the finished product reflects real attention to detail. Despite the complex design, the team delivered this building according to our adjusted contract program, achieving a high-quality standard.

It's fair to say, the new Mission House building was much-needed. The project began with a seismic assessment in 2017 resulting in the planned and controlled demolition of the original 1970's Mission House building. Maycroft were engaged under an Early Contractor Involvement (ECI) model for replacement of the Mission House building. During the ECI period, we assisted the project team through design developments with our construction expertise, programming and cost advice.

The old original building had been central to school administration operations and additional classrooms, and held a lot of fond memories for staff and students. The project was seen as an exciting opportunity to reimagine education and provide quality learning environments for Sacred Heart Lower Hutt students.

Designed in laminated timber on the footprint of the previous building, the two-storey Mission House building has become the visual and functional hub for the college. The administration and support services are on the ground floor - counselling rooms, meeting spaces, Deans rooms and staff facilities. The library, modern learning spaces, workrooms for staff, and storage spaces are all on the second floor.

We are delighted with the results and also with the opportunity it provided to strengthen our existing relationship with the College, IR Group and Robertson Architects.

Maycroft Joinery

Our team completed the full joinery fit-out, supplying and installing custom joinery throughout both levels.

Works included the reception area, staff kitchen and seating, general resource storage, library desk, computer desks, whiteboard joinery, display case, stairs, bleacher seating, and banquette seating.

Photo Gallery

previous
Next
No items found.

Other Projects

Hutt Valley Retrofit Programme

Hutt Valley Retrofit Programme

Government
Boulcott's Farm Heritage Golf Clubhouse

Boulcott's Farm Heritage Golf Clubhouse

Commercial & Workplace
PowerCo Fergusson Station

PowerCo Fergusson Station

Industrial & Infrastructure
Upper Hutt Railway Station

Upper Hutt Railway Station

Commercial & Workplace